Company History Of Equipment Removal And Project Relocation

 

  • Farmland Industries, Coffeyville, Ks. (Boilers, Stacks And Accessory Piping By Rail From Green Springs, Ohio To Coffeyville, Ks)
  • U S Air Products,(Removal Of Exchangers & Suction Drums)
  • Hydro Chemical Processing, Inc., Holly Springs, Ga.,(8 Sets Finfan Coolers, Assonet, Mass. To Holly Springs,Ga.)
  • M W Kellogg For Arco,(Nickel Oxide Reactor By Rail From Green Springs, Ohio To Channelview, Tx.)
  • D O K Industries, Houston, Tx.,(Glycol Skid & Tower From Gladewater, Tx To Houston, Tx)
  • Sterlite Industries (India) Limited, 92, Makar Chambers Iii, Narima  Point, Bombay Complete Removal And Matchmark Of Oxygen Plant, Kerens, Tx. [To Be Re-Assembled In India For Service]; Packaged For Shipment/Transportation To The Port Of Houston For Loadout On Freight Forwarding
  • Equipment Packaging For Above Job Also Performed For Rohde & Liesenfeld
  • 2 - 100 Ton Ammonia Plants Dismantled At Lovington, N.M., Loaded & Transported To Equipment Yard For Storage At Carlsbad, N.M.
  • Removed Tank Battery & Relocated For Ensearch Exploration, Inc., Opalacka Unit
  • 2-100 Ton Enren Design Ammonia Plants Dismantled, Match Marked & Loaded On Rail For Shipment From Carlsbad, N.M. To  China
  • Removed Matchmarked & Loaded On Rail One Ammonia Coating Facility & Structure For Apache Nitrogen Products, Inc. From Carlsbad, N.M. To Benson, Arizona
  • Removed 3 Cooper Bessimer Compressors At Kerens, Tx & Shipped To Houston By Truck For K & K Compression
  • Removal And Loadout Of Gas Sweeting Plant, Canadian, Tx For South Treaters
  • Removal, Matchmark, And Loadout Of 10,000 Barrel/Day Topping Plant For La-Fanirea Refining, Columbia
  • Removal, Loadout And Transport 1 Amine Treating Plant At Dreyfus Plant, Quero, Tx. For South Tex Treaters
  • Remove All The Equipment In Area F (Reactors, Towers, Pumps, Exchangers,Etc) At Hercules, Inc., Mcgreggor, Tx.
  • Remove And Loadout 1 Amine Plant, Anton Oil Field, Lubbock, Tx For South Tex Treaters
  • Remove And L0adout 1 Gas Stripping Plant, Plain Dealing, La. For South Tex Treaters
  • Remove, Matchmark, Loadout And Transport To The Port Of Houston, 1 Ethanol Plant, Located In Mermantau, La. For Greenwich Distillers Limited, Greenwich, London
  • Remove, Matchmark, Loadout And Transport To The Port Of Houston, 1 Methyl Ethyl Ketone Plant, For Lyondell Petrochemical Inc., Channelview, Texas
  • Remove, Matchmark And Load Out 1 Urea Plant, J R Simplot Location, El Centro California For Williams Contruction
  • Remove And Load Out 1 Nitric Acid Plant, Marsailles, Ill. For Williams Construction
  • Remove And Load Out 1 Nitric Acid Plant, Calgary, Canada For Mcconnell Metals Company, Cochabamba, Bolivia
  • Dismantle & Matchmark 1 Amonia Nitrate Plant, Westco Fertiizer, Calgary, For Austin Powder International
  • Remove And Loadout 1 Depropanizer Tower, Olkmulgee, Ok For Transamerica Refining Corporation
  • Remove And Loadout One Acid Processing And Storage Unit Located At Brunswick, Ga.
  • Tear Down And Remove One Grain Storage And Handling Part Of Texas Farm Products Located In Nacogdoches,Tx
  • Remove And Loadout One Synthesis Gas Facility Located In Longview, Tx. For Eastman Chemical Co.
  • Remove And Loadout One 700 T/Day Nitric Acid Plant Located At Farmland Industries, Lawrence, Ks For Abocol, Inc., Cartagena, Colombia
  • Dismantle And Load Out One 1000 T/Day Ammonia Plant Located At Farmland Industries, Lawrence, Ks. For Oman Chemicals & Pharmaceuticals Llc., Oman, United Arab Emirates 
  • Dismantle And Loadout Of One Tda Plant, Located At Rubicon, Inc., Geismar, La. For Shipment To China
  • Dismantle And Loadout Of One 1000 T/Day Ammonia Plant Located At Vanguard Synfuels, Llc, Pollock, For Shipment To China
  • Dismantle And Loadout Of One Ammonia Plant Located At Cytec Industries, Inc. Located In Westwego, La. For Shipment To China
  • Dismantle And Loadout Of Equipment Located At Pcs Nitrogen And Westlake Vinyl In Geismar, La, For Shipment To China
  • Dismantle And Loadout Of Nitric Acid Plant In Yazzo City, Ms For Wood Group Columbia S.A. On Behalf Of Abocol S.A.
  • 34. Dismantle And Loadout Of Urea Plant Located At The Old Terra Industries, Inc. In Blytheville, Ar. For Shipment To China
  • Dismantle And Loadout Of Hhe Compressors Located At Pcs Nitrogen, Geismar, La For Incitic
  • In Process Of Dismantling And Loadout Of A Buelher Solid State Polymerization (Ssp3) Plant Located In Florence, Sc., For Shipment To Canada.